Skip to main content
Inventory & Spares

What Is ROP (Reorder Point)?

The reorder point is the stock level at which a new order should be placed, so the item arrives before stock runs out.

Back to the glossary

The reorder point (ROP) tells you when to buy more. When stock on hand falls to this level, a replenishment order is triggered.

Reorder Point Formula

Reorder point = (Average daily usage × Lead time in days) + Safety stock

For example, if a filter is used at an average rate of 2 per day, the supplier lead time is 10 days and you hold a safety stock of 5, the reorder point is (2 × 10) + 5 = 25 units.

Safety Stock

Safety stock protects against uncertainty, such as unexpected spikes in usage or late deliveries. Critical items usually justify more safety stock than non critical ones.

Min and Max Levels

In maintenance stores, reorder points are often managed as minimum and maximum levels. When stock reaches the minimum, an order is placed to bring it back up to the maximum.

Keeping Reorder Points Accurate

  • Base them on actual usage recorded against work orders
  • Update lead times when suppliers change
  • Review them periodically, especially after changes in maintenance strategy

A CMMS can automatically generate purchase requisitions when stock falls below the reorder point.

See how Oriens puts ROP into practice.

Explore Oriens Inventory Management

Related Terms

Ready to modernise your asset management?

See how Oriens EAM and Oriens HSE bring maintenance, assets and safety together on one platform.

Request a Free Demo