Eliminate paper permits and approval bottlenecks. Oriens e-PTW digitises every step from permit creation and isolation management to real-time monitoring and automated closure with a complete audit trail.
PTW-2026-0441
Work Location
Block B3 · Level 2
Permit Type
General Permit
Valid From
21 Apr 2026 08:00
Valid Until
21 Apr 2026 18:00
LOTO / ISOLATION POINTS
APPROVAL CHAIN
Manual permit processes create serious safety gaps. Here's what most organisations are dealing with.
Paper permits get misplaced, are illegible, or arrive at the worksite missing critical approvals creating liability and safety exposure.
Multi-level sign-offs require physical presence of approvers. One absent signatory can halt critical maintenance work for hours.
Supervisors have no live view of which permits are active, which isolations are in place, or which jobs are approaching closure deadlines.
Permits expire or run over time without automated alerts. Equipment is re-energised before all workers have signed off, creating serious injury risk.
When incidents occur, paper records are incomplete, contradictory, or simply not available making root cause analysis and regulatory reporting difficult.
Without a system, different supervisors apply permit rules differently. High-risk tasks proceed without the required permits or precautions.
Oriens e-PTW covers the full permit lifecycle from creation to closure with the controls and traceability modern operations demand.
Create structured permits for all high-risk work types confined space, electrical isolation, working at height, cold work, excavation, and more from any device.
The hidden risk in work authorisation
of serious workplace incidents involve failure to control work permits
of permit violations occur due to poor shift handover and communication
faster permit approval and closure with digital authorisation workflows
Oriens e-PTW guides every permit through a structured, auditable lifecycle no step can be skipped, no sign-off bypassed.
The requesting supervisor raises a digital permit for the planned work, selects the permit type, describes the task, and identifies all involved persons and equipment.

A structured risk assessment is attached to the permit. Hazards, controls, and required PPE are documented. Isolation requirements are identified and recorded.

Approvers at each level (Supervisor, Area Owner, HSE Officer) receive instant notifications, review the permit details, and provide digital sign-off from any device.

The permit is issued to the working team. Real-time status is visible on the control room dashboard. Automatic alerts trigger for extensions, overruns, and safety violations.

Before work can close, all isolations must be reinstated, the area cleared, and all workers signed off. A final closure audit record is generated automatically.

Permit to Work works in isolation or as fully embedded within Oriens EAM sharing data with work orders, assets, maintenance schedules, and inventory.
Option A
Deploy Oriens e-PTW independently alongside your existing CMMS, ERP, or legacy systems via open REST API no full EAM adoption required.
Option B
↔ Oriens EAM
↔ Oriens HSE Modules
When part of the Oriens platform, e-PTW shares live data with Oriens EAM modules (work orders, assets, inventory) and other Oriens HSE modules (Incident Management, Risk Assessment) eliminating duplicate entry and joining safety workflows end-to-end.
Oriens e-PTW is used across industries where uncontrolled high-risk work creates serious injury, regulatory, and operational risk.
Refineries, rigs, and petrochemical plants managing hot work, confined space, and isolation permits.
Power generation facilities requiring strict electrical isolation, LOTO control, and working-at-height permits.
Process manufacturers controlling maintenance and shutdown work across multi-shift, multi-contractor environments.
Offshore platforms and shipyards with concurrent permit requirements and remote crew accountability.
Process plants managing permits for pressurised systems, toxic substances, and cleanroom environments.
Civil projects coordinating multi-contractor PTW workflows with confined space and working-at-height controls.
Everything you need to know before deploying a digital Permit to Work system.
Digital permits that enforce isolations, simultaneous operations checks, and safe work conditions on every job.